Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Feb 13, 2023     29-10 New Landing Gear Service Bulletin SB00007 - (5 hours)       Category: Landing Gear
Start of the retrofitting the Landing Gear mount following Service Bulletin SB00007. Although there are obviously no crack on the mounts i decided to implement the SB00007 right away in order to reduce difficult work once the airplane is built. Considering that i will operate from grass fields i believe it would be better to install the new gear mount instead of waiting for cracks to develop.
The kit provided by VANS has detailed instructions, drill guides and drill bushing to facilitate the work. Lucio helped a lot during this work.
The first step has been to drill the holes in the longerons using the drill guides and blocking the drill bushing in position with the help of clamps.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.